Projects /
MainLine
Customer Challenge:
Major European public transport system required five hardwood turnouts to be replaced with a longer lasting and better value product. The turnouts to be prefabricated by the customers chosen local contractor and delivered to site for installation.
Sicut Solution:
Mixture of Sicut composite sleeper with dimensions 152mm x 254mm x 2600mm, and 152mm x 304mm Sicut bearers were used for this project. All bearers and sleepers were delivered on time to the chosen contractors facility for preparation and installation.