Projects /
Light Rail & Tram
Customer Challenge:
Installation of new sleeper and bearers as part of a new track installation at a European amusement park, replacing the previous steel sleeper layout.
Sicut Solution:
The same screw fastening system was required to be used but with a far greater durable sleeper to reduce maintenance, track closure and sleeper replacement. Lengthy or frequent track closures would result in potential revenue loss for the client and negative PR. The use of Sicut sleepers with dimensions 152mm x 254mm provided better value to the client than using steel sleepers.